Reference Projects:
|
Chip and fibre handling, middle storage,
Metso Vanachai
|
| Project
nr: |
3235
|
 |
| Operation
date: |
2008 |
| Extent:
|
Silol
with discharge systems |
| Equipment: |
Three
Silos with rotor, two Silos with Sliding Frame,
Four Screw Conveyors, Three double screws |
| Material: |
Raw chip, Chips and fibre |
| More
info: |
Anders
Haglund
+46 (0)8 504 105 98 |
|
Fuel Infeeder, Stora Enso, Ala Sawmill
|
| Project
nr: |
3209
|
 |
| Operation
date: |
Summer
2008 |
| Extent:
|
New
fuel Infeeder to existing roster |
| Equipment: |
Fire
valve, Fuel Infeeder 2900 |
| Material: |
Bark, fuel chips |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Material handling, Rockhammarsbruk AB
|
| Project
nr: |
3209A
|
 |
| Operation
date: |
Spring
2008 |
| Extent:
|
New
fuel feeder line to existing oven. |
| Equipment: |
Screw
conveyor , elevator |
| Material: |
Bark, Fuel chips |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Material
handling, Eka Chemicals Rana AS
|
| Project
nr: |
2435/7A
|
 |
| Operation
date: |
Summer
2008 |
| Extent:
|
New
salt reception bins |
| Equipment: |
Doser
bin, Push Floor, Doser Screws |
| Material: |
Fly ash |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Ash silo disarge, Bravida, Umeå Dåvamyra
|
| Project
nr: |
3190
|
 |
| Operation
date: |
Spring
2008 |
| Extent:
|
Ash
silo disarge and handling after the storage silo |
| Equipment: |
Silo
bottom, Sliding frame, Dosing screw, Reversible
screw, Shut off valve and Disarge bellow |
| Material: |
Fly ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
9MW Bioenergy plant, Kraslava, Estland
|
| Project
nr: |
2717/07-2
|
|
| Take
over: |
Summer
2008 |
| Extent: |
Bio
energy plant |
| Equipment: |
Fuel
handling, prefurnace, ash & slaghandling. |
| Material: |
Bark dust and chips |
| Mer
info: |
Agneta
Sporrong
+46 (0)8-504 105 92 |
|
Raw chip handling, Arbor A/S Hattfjelldal
|
| Project
no: |
3166
|

|
| Operation
date: |
Winter
2007
|
| Extent:
|
Raw
chip handling before dryer |
| Equipment:
|
Push
floor bunker with levelling gates and level screw,
dosing screw. |
| Material: |
Raw chip |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Bed dryer equipment, Ena Kraft / Exergy
Consulting
|
| Project
no: |
3136-2
|

|
| Operation
date: |
2008 |
| Extent: |
Fuel
Bed dryer equipment |
| Equipment: |
Spreading
screw, push floor, reduction screw, scraper conveyor,
dosing screw. |
| Material: |
Raw chips |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Ash silo disarge, Ekokem, Alstom Finland
|
| Project
no: |
3158
|

|
| Operation
date: |
Winter
2008 |
| Extent: |
Ash
silo disarge and handling after the storage silo |
| Equipment: |
Silo
bottom, Sliding frame, Dosing screw |
| Material: |
Fly ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Ash silo disarge, Borlänge Energi, Alstom
Power
|
| Project
no: |
2919-130 |

|
| Operation
date: |
Spring
2008 |
| Extent:
|
Ash
silo disarge and handling after the storage silo |
| Equipment: |
Silo
bottom, Sliding frame, Dosing screw |
| Material: |
Fly ash |
| Mer
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
2MW Bioenergy plant, Palivere, Estland
|
| Project
nr: |
2717/07-1
|
 |
| Take
over: |
dec
2007 |
| Extent: |
Bio
energy plant |
| Equipment: |
Fuel
handling, prefurnace, ash & slaghandling |
| Material: |
Bark dust, chips and peat |
| More
info: |
Agneta
Sporrong
+46 (0)8-504 105 92 |
|
Raw chip handling, Gotlandsflis
|
| Project
no: |
2602-19
|

|
| Operation
date: |
Winter
2007
|
| Extent: |
Raw
chip handling before dryer |
| Equipment: |
Dosing
box with push floor, levelling gates and level screw,
dosing screw, scraper conveyor |
| Material: |
Raw chip |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Fuel handling, Göteborgs Energi / Chalmers
Panncentral
|
| Project
no: |
3140-1
|

|
| Operation
date: |
Winter
2007 |
| Extent: |
Fuel
handling for biomass gasification plant |
| Equipment: |
Dosing
screw, elevator, transport screw, rotary valve and
shut of valve. |
| Material: |
Raw chips and pellets |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Fuel Handling, Katrineholms Energi
|
| Project
no: |
3019-2
|

|
| Operation
date: |
Winter
2007 |
| Extent: |
Fuel
handling |
| Equipment: |
Dosing
screw. |
| Material: |
Pellets |
| Mer
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Ash silo disarge, Ekokem, Alstom Finland
|
| Project
no: |
3158
|

|
| Operation
date: |
Winter
2008 |
| Extent: |
Ash
silo disarge and handling after the storage silo |
| Equipment: |
Silo
bottom, Sliding frame, Dosing screw |
| Material: |
Fly ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Energy Plant for Biomass Fuel 6MW,
Vink sion, Netherland
|
| Projekt
no: |
3127 |

|
| Operation
date: |
2007 |
| Extent: |
Combustion
handling, pre-oven, ash handling |
| Equipment: |
Two
push floor pockets, combustion scrape, damper, infeeder,
grate and wet scrape |
| Material: |
Solid biomass fuel 35-55% damp |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80 |
|
Chip Handling, Storuman Väme,
Storuman
|
| Projekt
no: |
3072/3 |

|
| Operation
date: |
Summer
2007 |
| Extent: |
Chip
Handling |
| Equipment: |
Push
Floor, Two double screw, Three Conveyors, Three
transport screws, Elevator, Sliding frame, Three
Scraper conveyors |
| Material: |
Chips |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
Pellet Silo, TPS, Umeå Energi AB
|
| Projekt
no: |
2671/10 |
 |
| Operation
date: |
2006/11 |
| Extent: |
Pellet
Storage and dosing to the mills. |
| Equipment: |
Pellet
Silo 800m3, Gliding frame, Two Dosing screws |
| Material: |
Wood pellet |
| More
info: |
Olof
Eriksson
+46 (0)8-504 105 80 |
|
Pellet Handling, TPS, Söderenergi
Fittjaverket
|
| Projekt
no: |
2671/11 |
 |
| Operation
date: |
2007/1 |
| Extent: |
Pellet
Handling |
| Equipment: |
Reception
station, pellet storage, 2500m3, transport system
and dosing for the mills, storage silo wood powder |
| Material: |
Wood pellet |
| More
info: |
Olof
Eriksson
+46 (0)8-504 105 80 |
|
Bricket Handling, ACB Laminat, Brunflo
|
| Projekt
no: |
511/34 |
 |
| Operation
date: |
2007/1 |
| Extent: |
Bricket
Handling before combustion fuel silo |
| Equipment: |
Push
floor pocket, Leveling screw, infeeder screw, transport
screws, band elevator |
| Material: |
Brickets Ø65 |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Wood Chip Handling, Partex, Bangladesh
|
| Projekt
no: |
3107/7 |
 |
| Operation
date: |
2007/2 |
| Extent: |
Handling
after the mills and before the sieve |
| Equipment: |
Scraper
Conveyor TKF800LB, vertical screw V400 with feeding
screw |
| Material: |
Wood Chips |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Ash Silo Conveyor, Boden Energi
|
| Projekt
no: |
2919/131D
|
 |
| Operation
date: |
2007/3 |
| Extent: |
Ash
Silo Conveyor and handling after storage silo |
| Equipment: |
Gliding
frame, dosing screw, reversible transport screw |
| Material: |
Air
Ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Grate 3,5 MW, Lapinlahti, Finland
|
| Projekt
no: |
3120 |
 |
| Operation
date: |
2007 |
| Extent: |
Grate
and Infeeder system |
| Equipment: |
Grate
7SAX 1748, damper, Infeeder 1750 |
| Material: |
Solid biomass fuel 35-55% damp |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80 |
|
Two Grates 4,4 MW and 6,7 MW, Putkimma,
Finland
|
| Projekt
no: |
2927/1
|
 |
| Operation
date: |
2007 |
| Extent: |
Drawings |
| Equipment: |
Two
Grates |
| Material: |
Solid
biomass fuel 35-55% damp |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80 |
|
Sludge Handling, Illmajoki, Finland
|
| Projekt
no: |
2852/14 |
|
| Operation
date: |
2007 |
| Extent: |
Sludge
Handling |
| Equipment: |
Three
gliding frames, Conveyor |
| Material: |
Sludge |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
Energy Plant for Biomass Fuel, SÅBI
Vaggeryd, 10MW Hot gas
|
| Projekt
no: |
3122 |
 |
| Operation
date: |
2006 |
| Extent: |
Bioenergy
plant for pellet production. |
| Equipment: |
Scraper
conveyor, infeeder, pre-oven
10MW, emergency chimney, wet ash conveyor |
| Material: |
Wet
wood fuel 40-60% |
| More
info: |
Tomas
Wendt
+46 (0)8 504 105 94 |
|
Material handling, Derome Bioenergi AB,
Kinnaredssågen
|
| Projekt
no: |
3116 |


|
| Operation
date: |
2006/9 |
| Extent: |
Material
handling before driers and dry chip silo before
pellet process |
| Equipment: |
Vertical
screws, vibrating screen, transport conveyors and
scraper conveyor. Silo with gliding frame and dosing
screw. |
| Material: |
Raw
and dry chips |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Energy Plant for Biomass Fuel - 8MW
Skara Energi AB, Skara
|
| Projekt
no: |
3098 |


|
| Operation
date: |
2006 |
| Extent: |
Complete
Bioenergy plant |
| Equipment: |
Combustion
handling 1200m3, Push Floor 4x300m3, Leveling screw,
Scraper Conveyor, Dividing Screw, Fuel Infeedeing,
Pre-oven with Reciprocating Grate, Hot water oven
8MW, smokegas kondensor 2MW, Wet Scraper, Ash Scraper |
| Material: |
Chips,
bark |
| More
info: |
Tomas
Wendt
+46 (0)8 504 105 94 |
|
Reception pockets Bark and Raw chip,
Kinnaredssågen, Kinnared
|
| Projekt
no: |
2602/16 |

 |
| Operation
date: |
2006 |
| Extent: |
Reception
pockets to wet material in pellet factory |
| Equipment: |
Push
Floor , Levelings screws, Dosing Screws |
| Material: |
Raw
chip and bark |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Sludge Handling, Tivoliverken Sundsvall
|
| Projekt
no: |
2992/8 |
 |
| Operation
date: |
Summer
2006 |
| Extent: |
Sludge
handling after centrifuging, unloading to lorry. |
| Equipment: |
Two
silos with sliding frames, two feed screws |
| Material: |
Sludge |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
Sludge Handling, Kungsängsverket, Uppsala
|
| Projekt
no: |
1692/10 |
 |
| Customer: |
Purac
/ (Uppsala) |
| Operation
date: |
Spring
2006 |
| Extent: |
Sludge
Handling |
| Equipment: |
Two
Silos Ø5500 with Sliding Frames and top rotor,
two dosing screws DM500 |
| Material: |
Sludge |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
Ash Handling, Korsta Verket, Sundsvall
|
| Projekt
no: |
3087
|

 |
| Customer: |
LAB
A/S |
| Operation
date: |
2006 |
| Extent: |
Ash
Handling before and after ash storage silo, unloading
to lorry or dump |
| Equipment: |
Chain
transport, chain elevator, feeding screw, sliding
frame, dosing screw, reversible feeding screw |
| Material: |
Air
ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Dry chip silo, Stora Enso, Fors
|
| Projekt
no: |
2740-10A |

 |
| Operation
date: |
2006/8 |
| Extent: |
Silo storage after mills, and
conveyors to dust combustion
|
| Equipment: |
Silo,
sliding frame, dosing screw and transport screw |
| Material: |
Dry
chip |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Reception Silo Sludge, Sunne
Sewage Treatment Work, Sunne
|
| Project
no: |
2992/6
|
 |
| Customer: |
VA-ingenjörerna
|
| Operation
date: |
December
2005 |
| Extent: |
Complete
sludge reception pocket from
lorry, silo with opening hatch and conveyor |
| Equipment: |
Silo
hatch, Sliding frame and dosing screw |
| Material: |
Sewage
sludge |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Ash Silo Conveying, Torsviks Verket,
Jönköping
|
| Project
no: |
2919/120 |
 |
| Customer: |
Alstom
Power |
| Operation
date: |
June
2006 |
| Extent: |
Complete
silo bed including conveyor |
| Equipment: |
Sliding
frame, dosing screw |
| Material: |
Air
Ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
|
Silo system, Metso, Thailand
|
| Project
no: |
2285/181 |
 |
| Customer: |
Metso, Thailand |
| Operation
date: |
2005 |
| Extent: |
Silo
system to MDF factory. Fiber silo, dust silo |
| Equipment: |
Hydraulic
rotors HR2 2000/350+2xDA, HR 1750/250+2x2DA, HR2 2000/350
+2x2DA |
| Material: |
MDF-fiber,
fiber dust |
| More
info: |
Magnus
Spjuth
+46 (0)8-504 105 88 |
|
Sia Latgran Jaunjelgava, Lettland
|
| Customer: |
SIA
Latgran Jaunjelgava, Latvia |
 |
| Operation
date: |
March
2005 |
| Assignment: |
Deliver
all the equipment before the pellets pressers |
| More
info: |
Magnus
Landberg
+46 (0)8 504 105 93 |
|
Chip Handling, Metro, Thailand
|
| Project
no: |
2796/5 |
 |
| Customer: |
Metro
Particle co. |
| Operation
date: |
Summer
2005 |
| Extent: |
Expansion
handling, chipboard factory |
| Equipment: |
Chipboard
factory - Wet flakes, Wet chips, Dry flakes |
| Material: |
Slag
(sewage treatment work) |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
Tekniska Verken, Landskrona
|
| Project
no: |
3078-1 |
 |
| Customer: |
Tekniska Verken in i Landskrona Kommun |
| Operation
date: |
September
2005 |
| Extent: |
Rebuilding
of an existing fuel handling, before two combustion ovens. |
| Equipment: |
Screw
pockets |
| Material: |
Fuel
Chips |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93 |
|
Saw Dust Handling, Bränntorp
|
| Project
no: |
3090 |
 |
| Customer: |
Bränntorps Möbelfabrik AB |
| Operation
date: |
September
2005 |
| Extent: |
Handling
equipment for saw dust handling |
| Equipment: |
Push
Floor, Feeding Screw, Leveling screw |
| Material: |
Saw
dust handling, joinery waste |
| More
info: |
Olof
Eriksson
+46 (0)8 504 105 84 |
|
Sludge Handling, SWWTP, St Petersburg
|
| Project
no: |
3053 |

 |
| Customer: |
SWTP
/ Vodokanal |
| Operation
date: |
Autumn/winter
2005 |
| Omfattning: |
Sludge
handling, before combustion |
| Extent: |
Two
Silos Ø6400 with Sliding Frame, Two Screws DM450,
Two Screws DA 500, Two Screws TA450, One prepress screw
DDA500 with two sludge solid pumps, one hydraulic hatch
and one greas seperator |
| Material: |
Sludge
(sewage Treatment Work) |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98 |
|
|
SAXLUND AB - P.O. Box 79, SE-137 22 Västerhaninge,
Sweden - Tel: +46 (8) 504 105 80
|
|
|