| On this side we present the ongoing
projects at the moment. |
Wet ash submerge conveyor for Bio-furnace,
Värnamo
|
| Project
nr: |
3246
|
 |
| Operation
date: |
2008 |
| Extent:
|
Wet
ash disarge from Bio-furnace to wet ash storage |
| Equipment: |
Two
submerge conveyors and one dry scraper conveyor. |
| Material: |
Bottom ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90 |
|
Dry chip silo and material handling, Forsnäs
|
| Project
nr: |
3122
|
 |
| Operation
date: |
2008 |
| Extent:
|
Middle
storage silo 200m3 with Sliding frame disarge |
| Equipment: |
Silo,
Sliding frame, Disarge screw, Transport screw. |
| Material: |
Dry chip |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90
|
|
Sludge handling, Krüger Pomorzany
|
| Project
nr: |
3104
|
 |
| Operation
date: |
2008 |
| Extent:
|
Sludge
handling |
| Equipment: |
Two
Silos with Push Floor, Valves and discharge conveyors. |
| Material: |
De-watered sludge |
| More
info: |
Anders
Haglund
+46 (0)8 504 105 98 |
|
12MW Bioenergy Plant, Nässjö
|
| Project
no: |
3135
|

|
| Take
over: |
Spring
2008 |
| Extent: |
Bioenergy
plant with condensator |
| Equipment: |
Turn
Key delivery |
| Material: |
Peat and chips |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80
Tomas Wendt
+46 (0)8 504 105 94 |
|
16MW Bioenergy Plant and 12 MW oil
combustion, Skinnskatteberg
|
| Project
no: |
3133
|

|
| Take
over: |
Spring
2008 |
| Extent: |
Bioenergy
plant |
| Equipment: |
16MW
Bioenergy plant with electric filter and 12MW oil combustion |
| Material: |
Peat and chips |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80
Tomas Wendt
+46 (0)8 504 105 94 |
|
Sludge handling, Skanska Oy, Salo Finland
|
| Project
no: |
3161
|
 |
| Take
over: |
Autumn 2008 |
| Extent: |
Sludge
handling with storage 2x60m3, disarge to truck |
| Equipment: |
Two
storage silo 60m3, sliding frame, disarge screw, shut
off valve |
| Material: |
Dewatered savage sludge |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98
|
|
Material handling, Nordic Paper, Säffle
Sweden
|
| Project
no: |
3265
|
 |
| Take
over: |
autumn 2008 |
| Extent: |
Chain
elevator |
| Equipment: |
Chain
elevator 10m3/h |
| Material: |
Stone 5-7mm |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80
|
|
Material
handling, Kronospan, Strzelce Poland
|
| Project
no: |
3261
|
 |
| Take
over: |
Winter 2008/2009 |
| Extent: |
Material
handling and receiving bin 2x750m3 |
| Equipment: |
2xPush
floor, 2xlevel screw, scraper conveyor |
| Material: |
Chips
|
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98
|
|
Sludge handling, Borås stad, Borås Sweden
|
| Project
no: |
3252
|
 |
| Take
over: |
Winter 2008/2009 |
| Extent: |
Receiving
silo for truck, sliding frame, disarge screw |
| Equipment: |
Silo
with hydraulic lid 30m3, |
| Material: |
Dewatered savage sludge |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98
|
|
Bio Energy Plant, 10MW Hot Water, Sävar Saw
|
| Project
no: |
3217
|
 |
| Take
over: |
2009 |
| Extent: |
A
complete Bio Energy Plant |
| Equipment: |
Fuel
Handling, 950 m3, Fuel Infeeder, Pre-oven with mobile
grate, Hot Water Oven, 10 MW, electric filter, Dry Ash
Handling |
| Material: |
Bark and chips |
| More
info: |
Johan
Levander
+46 (0)8 504 105 80
Tomas Wendt
+46 (0)8 504 105 94 |
|
Ash conditioning, Umeå
|
| Project
nr: |
3190/1
|
 |
| Operation
date: |
2009 |
| Extent:
|
Ash
conditioning of fly ash |
| Equipment: |
Ash
conditioner in stainless design, 60m3/h. |
| Material: |
Fly ash |
| More
info: |
Daniel
Jakobsson,
+46 (0)8 504 105 90
|
|
Bio energy plant 6MW, Swedwood, Zbazynek Polen
|
| Project
no: |
3236
|
 |
| Take
over: |
Summar 2009 |
| Extent: |
Bio
energy plant, 3MW hot gas and 3MW thermal oil heater |
| Equipment: |
Scraper
conveyor, fuel in feeding system, combustion chamber with
moving grate and sander dust burner, thermal oil heater
3MW, multicyclone, dry ash handling, rotary feeder |
| Material: |
Saw dust, saw and sander dust, sludge |
| More
info: |
Magnus
Spjuth
+46 (0)8-504 105 88
Johan Levander
+46 (0)8 504 105 80
|
|
Bed dryer equipment, Averöy
|
| Project
no: |
3309
|
 |
| Take
over: |
Summer 2009 |
| Extent: |
Push
floor for bed dryer type Exergy |
| Equipment: |
Push
floor, Level screw, Distribution conveyor |
| Material: |
Wood chips |
| More
info: |
Magnus
Landberg
+46 (0)8-504 105 93
|
|
Material handling, Swedwood, Zbazynek
Poland
|
| Project
no: |
3253
|
 |
| Take
over: |
Summar 2009 |
| Extent: |
Material
handling and receiving bin for truck 150m3 |
| Equipment: |
Push
floor, level screw, scraper conveyor |
| Material: |
Chips |
| More
info: |
Anders
Haglund
+46 (0)8-504 105 98
|
|
Pellet plant, Grycksbo
|
| Project
no: |
3263
|
 |
| Take
over: |
Summer 2009 |
| Extent: |
Outer
material handling |
| Equipment: |
Push
floor, Level screw, Dosing screws, Transport screws, Reversible
screw, Fire shut off valve, Belt elevator, Silo 1000m3,
Sliding frame. |
| Material: |
Pellet |
| More
info: |
Olof
Eriksson
+46 (0)8-504 105 80
Magnus Landberg
+46 (0)8-504 105 93
|
|